ATKINSON 3" SCALE STEAM WAGON

steam1.jpg (20244 bytes)

SPECIFICATION

SPACE

LENGTH 1498.6mm
HEIGHT 609.6mm
WIDTH 508mm
Rear Wheel Diameter � 231.77mm
Front Wheel Diameter 200mm

1. Drawings; Rough Castings; Raw Materials; Boiler Fittings; Screw & Fasteners

��� Supplied by:-

����������������������� A.J.Reeves & Co (Birmingham) Ltd Tel 0121 779 6831

����������������������� Holly Lane, Marston Green, Birmingham. B377AW

�

2. Copper Boiler Supplied by:-

����������������������� John. M. Ellis (Model Engineer) Tel 01384 872122

����������������������� Unit 3, Fainfield Drive, Off Stone Lane, Kinver, West Midlands, DY76EQ

�

3. Machining; Construction & Assembly by:-

����������������������� Dennis. J. Rogers (Retired Engineer)

�

4. Cost:-

����������������������� Materials �2,200; Boiler �837

�

5. Construction Calendar & Days Worked

�����������

����������� Note: Days worked = Full day; halfday or part of day depending upon other

����������� commitments.

�

22nd Jan 1996 - Start machining engine components.

����������� 105 Days worked + 10 days on fixtures and machining aids.

Atkin3.jpg (31547 bytes)

Atkin2.jpg (16723 bytes)���� Atkin1.jpg (9607 bytes)

3rd July 1996 - Run engine on compressed air for first time. Start machining water pump

components.

Atkin7.jpg (18548 bytes)

����������� 16th Days worked + 1 day on fixtures and aids.

10th Aug 1996 - Engine together with water pump & valves complete. Start machining rear

axle components

����������� 22 Days worked

Atkin6.jpg (13736 bytes)

17th Sept 1996 - Rear axle including differential, brake drum, spring brackets and wheels

complete. Start machining boiler components.

����������� 9 Days worked

Atkin8.jpg (17197 bytes)

28th Sept 1996 - Boiler components complete including regulator. Start machining front

axle.

����������� 11 Days worked

11th Oct 1996 - Front axle including track rod complete. Start making front & rear leaf

springs and fittings.

����������� 4 Days worked

15th Oct 1996 - Springs complete & fitted to axles. Start chassis construction.

����������� 6 Days worked

22nd Oct 1996 - Chassis frame complete. Start foot plate & engine mounts.

����������� 4 Days worked

28th Oct 1996 - Foot plate & engine fitted to chassis. Start machining foot plate

components.

����������� 17 Days worked

4th Dec 1996 - All components including boiler & water heater fitted to foot plate. Start

watertank construction.

����������� 5 Days worked

11th Dec 1996 - Watertank including fittings complete. Start construction of cab.

����������� 17 Days worked

3rd Jan 1997 - Cab complete & fitted to foot plate also boiler manifold complete, all

valves fitted & pipework fitted to boiler. Start making ashpan.

����������� 3 Days worked

Atkinson Build - 4.jpg (29643 bytes)Atkinson Build - 5.jpg (37855 bytes)

8th Jan 1997 - Ashpan complete & fitted to boiler. Start construction of rear flatbed.

Removable back panel for cab and fitting's for fire grate.

����������� 5 Days worked

16th Jan 1997 - Flatbed; rear panel & fire grate complete and fitted. Start making cleading

sheet to lag boiler. Take wheels to have tyres moulded on.

����������� 2 Days worked

27th Jan 1997 - Lagging complete, Start machining safety valve block.

����������� 2 Days worked

16th Feb 1997 - Safety valves fitted. start stripping down for painting; Make mud guards

& collect wheels complete with tyres moulded.

����������� 35 Days worked

4th April 1997 - Painting complete & wagon assembly complete.

�

15th April 1997 - Start construction of seat to fit on rear flatbed.

����������� 4 Days worked

23rd April 1997 - Seat painted & complete.

�

TOTAL DAYS WORKED - 277 (EST 1800 HOURS)

�

8th to 12th May 1997 - Took wagon to A.J.Reeves to display during their

open weekend.

�

27th July 1997 - After a number of unsatisfactory trial steamings, resulting in

fitting stronger valve springs, ran successfully for first time.

�

Atkincb2.jpg

Indication of power

Video Footage

�

Atkinson Steam Wagon In Operation Clip 1

Atkinson Steam Wagon In Operation Clip 1

File Type: Real Video

File Size: 2.98 MB

�

Atkinson Steam Wagon In Operation Clip 2

Atkinson Steam Wagon In Operation Clip 2

File Type: Real Video

File Size: 2.22 MB

�

This Page Is Owned By Dennis John Rogers

Last Updated : 22nd July 1998

�1998

Email Address : [email protected]

The Current Time Is

This Page Has Been Accessed

Time's